nsb

Jan 31, 2017

Mass water waste due to NWSDB delay (video)

A broken pipeline near the 2nd kilometre post in the Waragoda, Kelaniya is leading to a massive waste of water.

 
The waste of water has been happening for around 04 days.

Although residents of the area have informed the National Water Supply and Drainage Board (NWSDB) of this broken pipeline, it is yet to be repaired.

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.

Top