Connect with us

News

Children’s Shadow Pradeshiya Sabha Polls today

Published

on

For the first time in Sri Lanka, children in 10 selected districts will elect their representatives for shadow local bodies formed by The Social Architects (TSA), in line with Sri Lankan’s Pradeshiya Sabha Act.

They will establish the first-ever Children’s Shadow Pradeshiya Sabhas (CSPS) in Sri Lanka.

TSA is a Charitable Trust working to promote participatory governance in Sri Lanka after witnessing the need to popularize the present Sri Lankan Local Governance Structure to the preteens and teens in 10 districts of Ampara, Anuradhapura, Batticaloa, Rathnapura, Jaffna, Kilinochchi, Matara, Mullaitivu, Nuwara Eliya and Polonnaruwa.

To participate, practice and enjoy democracy at a young age, children between ages 11-15, with the consent of their parents/guardians, will be casting their votes today (16) for 19 CSPS across the 10 districts. They will follow the process parallel to the Local Authorities Elections conducted under the mixed proportional system.

The children have submitted eight names for each party (Children for Earth; Children for Sustainable Development; Children for Fair Resource Allocation) for every CSPS and, in total, 24 names for each CSPS, i.e. 456 candidates. They also ensured female representation.

For more details: 

Radika (0772444278), Mayuran (0767011060) (Colombo)  

Regional Contacts:

Ampara – Nisanthy 0775 159 713
Anuradhapura – Wasala 0768 211892
Batticaloa – Thayalingam 0773 521 983
Rathnapura – Maduwanthi 0778 694981
Jaffna – Kajenthiran 0772 658 002
Kilinochchi – Thurka 0778 522 312
Matara – Manoja   0773 058679
Mullaitivu – Abojithan 0773 617 292
Nuwara Eliya – Jeyaraj 0775 282 589
Polonnaruwa – Milmini   0741 694387

Web Site : https://thesocialarchitects.net/

News

BASL Bar Council condemns Tiran Alles’ statement, calls for resignation

Published

on

By

The Bar Council of the Bar Association of Sri Lanka (BASL) yesterday passed a resolution condemning the recent statement made by Public Security Minister Tiran Alles calling upon newly-passed out police recruits that it was not a sin to eradicate criminals.

BASL President Kaushalya Nawaratne told the Sunday Times that the resolution was moved over the statement made by the Minister on Thursday at the passing out parade of specially-trained officers of the first combat motorbike unit to eradicate criminal elements in the Western and Southern Provinces at the STF Camp in Katukurunda, Kalutara.

The Minister told the officers “it is not a sin” to eradicate those involved in murders, selling drugs and trafficking drugs.

The Bar Council resolved that if the Minister does not step down, the President should take action to remove him from the Public Security Ministry post, Mr Nawaratne said.

The Bar Association stated that they would resort to local as well as international legal action if the Minister would not be removed from his position.

Mr Nawaratne said that the statement comes in the wake of a breakdown of the law and order situation and alleged that the Sri Lanka Police was involved in various illegal acts in the recent months.

(sundaytimes.lk)

(Except for the headline, this story, originally published by sundaytimes.lk has not been edited by SLM staff)

Continue Reading

News

Sri Lanka faces challenges in mega project implementation

Published

on

By

More than 300 contracts connected to 35 mega projects were suspended last year, and Rs. 2.3 billion was demanded as compensation by contractors for just nine of them, the Finance Ministry’s Project Management and Monitoring Department (PMMD) says, adding there is a probability that claims will also be submitted over another 22.

A total of 37 projects achieved no physical progress during the last quarter of 2023, according to the PMMD’s latest report released last month.

Among them are 17 projects out of 33 for which foreign disbursements were stopped.  Implementation delays are reported in 41 other projects owing to the poor performance of contractors. As this issue prevails in about 20 percent of total projects, it is important to consider the performance of contractors as a criterion for the renewal of their registration to resolve the repetition of this issue, the report states.

The PMMD’s latest data come amidst strong words in the International Monetary Fund’s (IMF) Governance Diagnostic Assessment, which pointed to recurrent problems in how successive Sri Lankan governments carried out mega projects.

Citing the PMMD’s 2022 fourth-quarter report, the multilateral lender notes that the most common issue affecting implementation is the delay in receiving allocation and imprest, “which proves that projects have commenced without appropriate budgetary allocations in the annual budget.” Another was the delay in land acquisition, it states, “again showing that projects are initiated without actually being ready”.

There are also procurement-related matters, the absence of performance indicators and outputs and the poor performance of contracts. And the Ministry of Finance “lacks basic information on projects, including the expected revenues and the potential cost of early termination given the limited data provided on projects and problems accessing necessary data”.

The PMMD’s new report says that delays have been a common practice, with “no evidence reported on actions taken against the responsible parties who have not taken appropriate steps for time management in projects, resulting in the failure of economic plans formulated based on the expected benefits of projects”.

The time period agreed upon for delivering outputs in an astounding 99 projects had lapsed at the end of last year while 20 of them obtained extensions beyond four years. Thirteen projects have not met even 25 percent of the expected target, even after more than half the project period, the PMMD notes.

For the first time, the PMMD has identified 30 projects that faced major implementation delays, including the Irrigation Ministry’s Uma Oya Multipurpose Development Project, which was inaugurated this week after ten extensions.

Another flagged project is the Irrigation Ministry’s Asian Development Bank-funded Mahaweli Water Security Investment Programme, the scope of which was drastically reduced by withdrawing 11 out of 21 packages owing to failure to execute them within the planned timeframe as well as the inability to begin new contracts in a restricted financial situation.

“The most complex tunnel construction package, which is currently ongoing and achieved about 20% progress, should be completed within 18 months and the balance loan amount of USD 159 million should be disbursed during this period Otherwise, that loan amount will be cancelled without any use.” the PMMD warns.

(sundaytimes.lk)

(Except for the headline, this story, originally published by sundaytimes.lk has not been edited by SLM staff)

Continue Reading

News

“230 rehab centers island-wide tackle drug addiction”

Published

on

By

The National Dangerous Drugs Control Board says that 230 rehabilitation centers have been established to treat drug addicts in the country.

Its Chairman Attorney Shakya Nanayakkara says that the services of these rehabilitation centers will commence from the 7th of May.

The centers can accomodate up to 20,000 patients.

(newsfirst.lk)
(Except for the headline, this story, originally published by newsfirst.lk has not been edited by SLM staff)

Continue Reading

Trending

Copyright © 2024 Sri Lanka Mirror. All Rights Reserved